Tayang pada
Undangan Prakualifikasi Pengadaan Batubara Untuk PLTU Cirebon 1x660 MW
PREQUALIFICATION ANNOUCEMENT FOR COAL PROCUREMENT FOR CIREBON COAL FIRED POWER PLANT 1x660 MW
PT Cirebon Electric Power (PT CEP) hereby invites eligible companies to participate in the prequalification for Coal Procurement for Cirebon Coal Fired Power Plant 1x660 MW.
Interested parties must hold one of the following valid licenses:
Production Operation Mining Business License / Ijin Usaha Pertambangan Operasi Produksi (IUP-OP)
Coal Contract of Work (CCoW) / Perjanjian Karya Pengusahaan Pertambangan Batubara (PKP2B)
Special Mining Business License for Production Operation / Ijin Usaha Pertambangan Khusus Operasi Produksi (IUPK-OP)
Special Production Operation Mining Business License for Transportation and Sales / Ijin Usaha Pertambangan Operasi Produksi Khusus (IUP-OPK) untuk Penangkutan dan Penjualan
Transportation and Sale License / Ijin Pengangkutan dan Penjualan (IPP)
General Requirements:
Annual coal requirement : maximum estimated at 3.11 million metric tonnes
Term of contract : 5 years with a maximum of 2 (two) x 5-year extensions
Coal Supply Agreement : To be entered and signed in 2025
Coal delivery commencement : 1 January 2027
Coal Specification Requierments:
Description
Range
Rejection Limit
Gross Calorific Value kcal/kg (ar)
Min 4.500
< 4,500
Total Moisture % (ar)
22-34
>34
Ash Content % (ar)
Max 4.5
>4.5
Total Sulphur Content % (ar)
Max 0.2
>0.2
Operation Status
Current Operating Mine
Minimum Reserve: ≥5 million Tonnes
Registration & PQ Document Distribution
Date/Time
28 May -11 June 2025
Place
By electronic mail (email):
coal@cirebonpower.co.id
Aanwijzing : 04 June 2025
Submission Dateline: 19 June 2025 & 15.00 WIB
Complate requirements for Prequalification will be provided in the Prequalification Document.
Jakarta, 28 May 2025
PT Cirebon Electric Power