Tayang pada

Undangan Prakualifikasi Pengadaan Batubara Untuk PLTU Cirebon 1x660 MW

PREQUALIFICATION ANNOUCEMENT FOR COAL PROCUREMENT FOR CIREBON COAL FIRED POWER PLANT 1x660 MW

PT Cirebon Electric Power (PT CEP) hereby invites eligible companies to participate in the prequalification for Coal Procurement for Cirebon Coal Fired Power Plant 1x660 MW.

Interested parties must hold one of the following valid licenses:

  • Production Operation Mining Business License / Ijin Usaha Pertambangan Operasi Produksi (IUP-OP)

  • Coal Contract of Work (CCoW) / Perjanjian Karya Pengusahaan Pertambangan Batubara (PKP2B)

  • Special Mining Business License for Production Operation / Ijin Usaha Pertambangan Khusus Operasi Produksi (IUPK-OP)

  • Special Production Operation Mining Business License for Transportation and Sales / Ijin Usaha Pertambangan Operasi Produksi Khusus (IUP-OPK) untuk Penangkutan dan Penjualan

  • Transportation and Sale License / Ijin Pengangkutan dan Penjualan (IPP)

General Requirements:

  • Annual coal requirement               :  maximum estimated at 3.11 million metric tonnes

  • Term of contract                             : 5 years with a maximum of 2 (two) x 5-year extensions

  • Coal Supply Agreement                 : To be entered and signed in 2025

  • Coal delivery commencement      : 1 January 2027

  1. Coal Specification Requierments:

    Description

    Range

    Rejection Limit

    Gross Calorific Value kcal/kg (ar)

    Min 4.500

    < 4,500

    Total Moisture   % (ar)

    22-34

    >34

    Ash Content      % (ar)

    Max 4.5

    >4.5

    Total Sulphur Content    % (ar)

    Max 0.2

    >0.2

    Operation Status

    Current Operating Mine


    Minimum Reserve: ≥5 million Tonnes

  2. Registration & PQ Document Distribution

    Date/Time

    28 May -11 June 2025

    Place

    By electronic mail (email):

    coal@cirebonpower.co.id

  3. Aanwijzing : 04 June 2025

  4. Submission Dateline: 19 June 2025 & 15.00 WIB

Complate requirements for Prequalification will be provided in the Prequalification Document.

Jakarta, 28 May 2025
PT Cirebon Electric Power

APBI Roadshow to Kalimantan

Coaltrans China 2025

CT Asia 2025

APBI Roadshow to Kalimantan

Coaltrans China 2025

APBI Roadshow to Kalimantan

Coaltrans China 2025

Alamat Sekretariat.

Menara Kuningan Building.

Jl. H.R. Rasuna Said Block X-7 Kav.5,

1st Floor, Suite A, M & N.

Jakarta Selatan 12940, Indonesia

Email Sekretariat.

secretariat@apbi-icma.org

© 2025 APBI-ICMA

Situs web dibuat oleh

Alamat Sekretariat.

Menara Kuningan Building.

Jl. H.R. Rasuna Said Block X-7 Kav.5,

1st Floor, Suite A, M & N.

Jakarta Selatan 12940, Indonesia

Email Sekretariat.

secretariat@apbi-icma.org

© 2025 APBI-ICMA

Situs web dibuat oleh

Alamat Sekretariat.

Menara Kuningan Building.

Jl. H.R. Rasuna Said Block X-7 Kav.5,

1st Floor, Suite A, M & N.

Jakarta Selatan 12940, Indonesia

Email Sekretariat.

secretariat@apbi-icma.org

© 2025 APBI-ICMA

Situs web dibuat oleh